Alto-Shaam 10.10ESG Oven User Manual


 
GAS COMBITHERM INSTALLATION MANUAL #MN-28676
PG. 10
®
COMBITHERM
LOCATION SITE & INSTALLATION REQUIREMENTS
THE OVEN MUST REMAIN ON
THE PALLET WHILE BEING
MOVED TO THE INSTALLATION
SITE BY FORK LIFT OR
PALLET LIFT TRUCK.
NOTE: Note dimensions required for doorways
and aisles for access of the oven and pallet
to the installation site. Transport the oven
in an upright and level position only. Do
not tilt the oven.
®
INSTALLATION CODES & STANDARDS
The following codes and standards are required for installation of this oven:
AIR SUPPLY, ELECTRICAL CONNECTIONS, WATER CONNECTIONS, GAS
CONNECTIONS, GAS EXHAUST, AND WASTE WATER DISCHARGE.
Installation must comply with local codes required for gas appliances. In the
absence of local codes, installation must comply with the National Fuel Gas Code,
ANSI Z223.1 (latest edition). In Canada, the appropriate code is the Natural Gas
Installation Code, CAN/CGA-B149.1 or the Propane Installation Code, CAN/CGA-B.
Adherence to code by a qualified installer is essential for the following: Gas
Plumbing, Gas Appliance Installation, Commercial Cooking Ventilation, Water and
Plumbing, and OSHA Regulations.
D A N G E R
IMPROPER INSTALLATION,
A
LTERATION, ADJUSTMENT,
SERVICE, OR MAINTENANCE COULD
RESULT IN SEVERE INJURY, DEATH
OR CAUSE PROPERTY DAMAGE.
READ THE INSTALLATION,
OPERATING AND MAINTENANCE
INSTRUCTIONS THOROUGHLY
BEFORE INSTALLING OR SERVICING
THIS EQUIPMENT.
D A N G E R
AVERTISSEMENT : UNE INSTALLATION,
UN AJUSTEMENT, UNE ALTÉRATION,
UN SERVICE OU UN ENTRETIEN NON
CONFORME AUX NORMES PEUT CAUSER
DES DOMMAGES À LA PROPRIÉTÉ, DES
B
LESSURES OU LA MORT.
LIRE ATTENTIVEMENT LES DIRECTIVES
D’OPÉRATION ET D’ENTRETIEN AVANT
DE FAIRE L’INSTALLATION, OU
L’ENTRETIEN DE CET ÉQUIPEMENT.