Anetsberger Brothers 14VF Fryer User Manual


 
4
IMPORTANT: Read the Code Requirements
and ALL installation instructions carefully,
before starting the installation. Contact the fac-
tory (800/ 837-2638) if any problems or ques-
tions arise.
The fryer installation must conform with local
codes, or in the absence of local codes, with the
National Fuel Gas Code, ANSI Z223.1 (latest
edition); the Natural Gas Installation Code, CAN/
CGA-B149.1 (latest edition); or the Propane Gas
Installation Code, CAN/CGA-B149.2 (latest
edition), as applicable, including:
a. Disconnect the fryer and its individual shutoff
valve from the gas supply piping system during
any pressure testing of the gas supply system at
test pressures in excess of ½ psig (3.45 kPa).
b. Isolate the fryer from the gas supply piping
system during any pressure testing of the gas
CODE REQUIREMENTS
FRYER ELECTRICAL SPECIFICATIONS
The ANETS Fryer Model 14VF/14VFS requires no external electric power source.
Figure 1 is the wiring diagram of an ANETS 14VF Fryer.
supply system at test pressures equal to or less
than ½ psig (3.45 kPa).
c. For fryers utilizing floor casters, the fryer instal-
lation shall be made with a connector that
complies with the Standard for Connectors for
Movable Gas Appliances, ANSI Z21.69
(latest edition) or CAN/CGA 6.16 (latest
edition), and a quick-disconnect device that
complies with the Standard for Quick-Discon-
nect Devices for Use with Gas Fuel, ANSI
Z21.41 or CAN/CGA 1-6.9 (latest edition).
d. Restrict the movement of a caster-equipped
fryer by using a limiting device (for example, a
cable attached both to the fryer and to a fix-
ture attached to the site structure) to avoid
depending on the connector and the quick-
disconnect device or its associated piping to
limit fryer movement.
Figure 1. Fryer Model 14VF/14VFS Wiring Diagram