Bunn TWIN Coffeemaker User Manual


 
Page 13
Fill or refill does not shut "OFF"
(ON/OFF Switch "OFF")
2a. Water Level Probe Sensing Sys-
tem (CDBC)
2b. Water Level Probe Sensing Sys-
tem (CEZ)
3. Refill valve or control board
(CDBC & CEZ)
4. Water is too conductive for proper
operation when using the factory
setting of sensing threshold.
1. Refill valve or control board
(CDBC & CEZ)
A) Disconnect the brewer from the
power source. Disconnect the J3
connector from the control board.
Check for continuity from the nut
on top of the level probe to pin 1 of
the plug, continuity should be
present. Pull the temperature probe
up about an inch from the grom-
met. Check for continuity from the
outside surface of the temperature
probe and pin 4 of the plug, conti-
nuity should be present. Connect
the J3 plug to the control board and
proceed to step 3.
B) Disconnect the brewer from the
power source. Disconnect the J5
connector from the control board.
Check for continuity from the nut
on top of the level probe to pin 5 of
the plug, continuity should be
present. Pull the temperature probe
up about an inch from the grom-
met. Check for continuity from the
outside surface of the temperature
probe and pin 2 of the plug, conti-
nuity should be present. Connect
the J5 plug to the control board and
proceed to step 3.
Press ON/OFF switch to "ON" (Indi-
cator lamp should be lit). If water
continuously flows out of air vent
tube, disconnect the brewer from
the power source. If water flow
stops, replace the control board. If
water flow does not stop, repair or
replace the refill sol-enoid.(See page
31)
Reset the
Water Sensing Threshold
Adjustment Procedures
on page 9.
If water continuously flows out of
air vent tube, disconnect the brewer
from the power source. If water
flow does not stop, repair or replace
the refill solenoid. If the valve closes
when power is removed, replace
the control board. (See pages 22 &
23)
PROBABLE CAUSE REMEDY
PROBLEM
TROUBLESHOOTING (cont.)
REFILL CIRCUIT (cont.)
29319 091203