GE CV936 Ventilation Hood User Manual


 
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Installation Instructions
1 Ft = 0.3 m
1” = 2.5 cm
Additional Materials:
120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
Strain relief for junction box.
7” round metal duct or 3¼” x 12” rectangular duct, length
to suit installation.
REMOVE THE PACKAGING
Remove parts package from the “V” shaped cardboard
insert. Remove insert. Remove shipping pads.
Lift the hood out of the box.
CAUTION:
Lift hood by grasping the outside edges of the exhaust
opening on the top. Do not lift hood by the exhaust
opening divider – damage will occur.
11
Duct tape
¼” pivoting hex socket
Pencil and
tape measure
Spirit level
Phillips and
Flat blade screwdrivers
Electric drill with
1/8” and 3/8” bits
cUL Listed Wire nuts
Hammer
Safety glasses
Metal snips
Flashlight
Pliers
Wire Cutter/Stripper
Saber saw or Key Hole Saw
Ladder
Allen Wrench
Remove transition duct piece from the inside of the
hood. Discard screws.
The vent hood motor is shipped secured to the skid
with 4 screws. Locate and remove 2 screws on each
side of the motor. Discard the shipping skid.
From the inside of the hood, remove shipping screws
holding the wood mounting piece to the back side of
the hood. Set aside wood mounting piece and screws
for later installation. Do not discard.
Remove junction box cover and knockout.
Install strain relief onto back or top of hood.
Remove all tape and packing material from the hood,
duct transition and motor.
Hood
Motor
Mounted on
Skid
Wood
Mounting
Support
Shipping Carton
Duct
Transition
Parts
Package
Hold Down Screws
Hold Down Screws