Hobart M802CE Mixer User Manual


 
6
INSTALLATION.
Prior to installation, verify that the electrical service agrees with the specifications on the
machine data plate.
UNPACKING.
Immediately after unpacking the mixer, check for possible shipping damage. If this
machine is found to be damaged, save the packaging material and contact your nearest
Hobart sales office.
LOCATION.
Place the mixer in its operating location. There should be adequate space around the
mixer for the user to operate the controls and install and remove bowls. The area above
the mixer should allow the top cover to be removed for routine maintenance and
servicing.
Holes are provided in the base for permanent bolting to the floor in normal installation.
Once located, the mixer must be leveled.
Remove the top cover screws and the top cover.
Place a level on the machined surface of the transmission case (Fig. 1) and slide
shims under the legs (base) of the mixer as required to level it front-to-back and side-
to-side.
Do not replace the top cover until installation is completed.
Fig. 1