IDEAL INDUSTRIES BUC5034 Range User Manual


 
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing
11
ASSEMBLY
Boiler GTE 4 150 GTE 5 150 GTE 4 250 GTE 5 250
Boiler Body
delivered loose
- front section
- intermediate section
- rear section
- set of assembly rods
- accessory package
Mounted boiler
body with
accessories
Control Panel -
Standard
Casing
Domestic Hot 150
Water Tank 250
Front Panel of tank
3.2 FALCON GTE COMBINATION BOILER
Tools required: - Phillips head screwdriver
- Wide flat screwdriver
- 13mm spanner
Packaging: the tables below show the numbers of the packages
which make up the boiler. The packages are listed in the order in
which they are opened for assembly.
1111
2323
1111
----
IL 4 IL 5 IL 4 IL 5
IL 24 IL 25 IL 24 IL 25
IC 7 IC 7 IC 7 IC 7
IL 14 IL 15 IL 14 IL 15
BH 59 BH 59 - -
- - BH 9 BH 9
- - BH 47 BH 47
Hydraulic Connection
Kit
BH 46 BH 46 BH 46 BH 46
Hydraulic Connection
Kit
BH 46 BH 46 BH 46 BH 46
Domestic Hot
Water Sensor
AD 127 AD 127 AD 127 AD 127
The assembly of any optional devices purchased with the boiler is described in the instructions supplied with relevant device or in the
control panel instructions.
The list of available optional devices is provided in the applicable price list.
1. Refer to the assembly instructions supplied with the burner.
BUC5039
BUC5040