Middleby Marshall P/N 60250 Oven User Manual


 
3 P/N60250September28,2012
SECTION 2 – INSTALLATION
WARNING – After any conversions, readjustments, or service work on the oven:
• Perform a gas leak test. • Test for proper combustion and gas supply.
• Test for correct air supply, particularly to the • Check that the ventilation system is in operation.
burner blower.
WARNING - Keep the appliance area free and clear of combustibles.
WARNING – The oven must be installed on an even (level) non-ammable ooring and any adjacent walls
must be non-ammable. Recommended minimum clearances are specied in the Description section
of this manual.
WARNING – Do not obstruct the ow of combustion and ventilation air to and from your oven. There
must be no obstructions around or underneath the oven. Constructional changes to the area where the
oven is installed shall not affect the air supply to the oven.
CAUTION: To reduce the risk of re, the appliance is to be mounted on oors of noncombustible construction
with noncombustible ooring and surface nish and with no combustible material against the underside thereof,
or on noncombustible slabs or arches having no combustible material against the underside thereof, such con-
struction shall in all cases extend not less than 12 inches (304mm) beyond the equipment on all sides.
CAUTION: For additional installation information, contact your local Authorized Service Agent.
NOTE – There must be adequate clearance between the oven and combustible construction. Clearance must
also be provided for servicing and for proper operation.
NOTE – An electrical wiring diagram for the oven is located inside the machinery compartment.
NOTE: All aspects of the oven installation, including placement, utility connections, and ventilation requirements,
must conform with any applicable local, national, or international codes. These codes supersede the require-
ments and guidelines provided in this manual.
NOTE: In the USA, the oven installation must conform to local codes. In the absence of local codes, gas oven
installations must conform with the National Fuel Gas Code, ANSI Z223.1. Gas and electric ovens, when installed,
must be electrically grounded in accordance with local codes, or in the absence of local codes, with the National
Electrical Code (NEC), or ANSI/NFPA70.
NOTE: In Canada, the oven installation must conform with local codes. In the absence of local codes, gas
oven installations must conform with the Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Gas
Installation Code, CAN/CGA-B149.2, as applicable. Gas and electric ovens, when installed, must be electrically
grounded in accordance with local codes, or in the absence of local codes, with the Canadian Electrical Code
CSA C22.2.
NOTE: In Australia, the oven installation must conform with local codes. In the absence of local codes, gas
oven installations must conform with the requirements of AS5601/AG601, Gas, Electricity, and any other relevant
statutory regulations.