14
Operating Procedures Model 430 Torque
090114
Step 7
Install the front drip pan. Slide the long drip pan into the
hole in the front panel.
Figure 17
Step 8
Install the front drip tray and splash shield beneath the
door spout.
Figure 18
Step 9
Lay the air/mix feed tube (optional) in the bottom of the
mix hopper.
Figure 19
Sanitizing
Step 1
Prepare a pail of an approved 100 PPM sanitizing
solution (examples: 2- 1/2 gal. [9.5 liters] of Kay- 5R
or 2 gal. [7.6 liters] of Stera- SheenR). USE WARM
W ATER AND FOLLOW THE MANUFACTURER’S
SPECIFICATIONS.
Step 2
Pour the sanitizing solution into the hopper and allow
it to flow into the freezing cylinder.
Figure 20
Step 3
While the solution is flowing into the freezing cylinder,
brush clean the mix hopper , air/mix feed tube
(optional) and mix inlet hole.
Step 4
Place the power switch in the “WASH” position. This
will agitate the sanitizing solution in the freezing
cylinder. Allow the solution to agitate for five minutes.
Figure 21