1. Turn off power to the steamer.
2. Unplug the two wires from the thermostat.
3. Using a wrench, remove the thermostat.
4. To install a new thermostat, use a small amount of
heat sink compound (1 drop), applied to bottom of
thermostat. Seat the thermostat on the steam port
and connect.
5. Plug the thermostat into the wiring harness.
10.22 Steam Port Gasket
P/N 096736 P/N 099250
1. Shut off power to the steamer.
2. Remove the 1-1/8 inch steam hose by loosening the
clamp around the hose and sliding it away from the
steam port. Turn and pull to loosen hose and remove
from steam port.
3. With a wrench, remove the screws holding the
thermostat to the steam port.
4. Cut and fold up aluminum foil insulation blanket to
expose the two nuts which hold the steam port to the
cavity wall threaded studs.
5. With a wrench, remove the two nuts.
6. Remove the steam port.
To Install:
7. Put a small bead of silicone sealant in and around
the groove in the steam port to seal any possible
leaks, or use gasket P/N 099250.
8. Install steam port on threaded studs. Secure with two
nuts.
9. Fold down aluminum foil insulation blanket to original
blanket position and repair cuts with aluminum foil
duct tape.
10. Reinstall thermostat as described in 10.20 above.
11. Reinstall steam hose to steam port and install the
clamp.
10.23 Cavity Steam Hose Assemblies
P/N 099953 (Top)
P/N 088880 (Bottom)
There are two hoses which connect the steam
generators with their respective cavities. One for the top
cavity and one for the bottom cavity. If both hoses are to
be replaced, replace them one at a time.
1. Shut off power to the steamer.
2. Remove cavity side and lower side panels of table.
3. In the upper portion of the steamer, remove hose.
Turn and pull the hose to remove it from the hose
nipple.
4. In the lower section of the steamer, remove the hose
clamp from where the hose is connected to the
steam generator. Turn and pull the hose to remove it
from the hose nipple.
5. The hose may be removed. Be careful that the hose
clamps do not fall off and get lost.
IMPORTANT: Make sure that the correct part (and
part number) are being used. The two hoses in the
steamer are of different lengths. (See Page 21 for
Part Numbers.)
To Install:
6. Slide the two hose clamps onto the hose and
position the hose adjacent to the steam port and
steam generator.
7. Slide the hose onto the hose nipple on the steam
port and at the other end, onto the steam generator
nipple. Make sure the hose is on all the way so that
the end of the hose is against the face of the nipples.
8. Install the hose clamps 3 mm (1/8") from the end of
the hose.
10.24 Door Removal/Installation/Alignment
P/N 094150
1. To remove the door, turn off the steamer power and
allow the steamer to cool. Then, remove door by
supporting the weight of the door and remove hinge
pin.
2. Place the door on a flat, clean table or similar
support, with gasket facing up. Be careful not to
scratch door surface.
3. Inspect door gasket for signs of cuts or other defects
which may impair its function. Replace if necessary.
To Install:
4. To install the door, apply NEVER-SEEZ lubricant to
hinge pin. Align door with hinge and insert hinge pin.