Vulcan-Hart F-37418 Range User Manual


 
Page 21 of 36
Top Section Burner Control Valve
WARNING: Always perform the Electrical Lockout/Tagout procedure before removing
any sheet metal panels or attempting to service this equipment. Failure to comply with
this procedure can cause property damage, injury or death.
WARNING: Perform the GAS LOCKOUT/TAGOUT procedure before servicing the unit.
1. Perform the MANIFOLD COVER removal procedure.
2. Remove the burner grates and deflectors.
3. Remove the burner head(s).
4. Carefully move the burner assembly away from the top section burner control valve.
5. Remove the top burner control valve from the gas manifold.
6. Remove any residual tape from the fittings and coat the threads with new gas-rated
(yellow) Teflon tape.
WARNING: All gas joints disturbed during servicing must be checked for leaks.
Do not use an open flame. Use a hazardous gas tester or a soap and water
solution (Bubbles indicate a gas leak). Failure to comply can cause property
damage, injury or death.
7. Reverse the procedure to install the top burner control valve.
8. Test the oven to verify proper operation.
Figure 24: Top Burner Control Valve Removal
Convection Motor Fan Control Switch (C Model)
WARNING: Always perform the Electrical Lockout/Tagout procedure before removing
any sheet metal panels or attempting to service this equipment. Failure to comply with
this procedure can cause property damage, injury or death.
1. Perform the CONTROL PANEL removal procedure for the convection oven steps 1-12.
2. Connect the electrical connector to the convection motor fan control switch through the
hole in the control panel.
3. Insert the convection motor fan control switch into the slot in the control panel until the
lock tabs click into place.
4. Reverse the CONTROL PANEL removal procedure for the convection oven to reinstall
the control panel.