Vulcan-Hart F-37418 Range User Manual


 
Page 8 of 36
WARNING: Perform the GAS LOCKOUT/TAGOUT procedure before servicing the unit.
1. Perform the ELECTRICAL LOCKOUT/TAGOUT Procedure.
2. Rotate the yellow gas shut-off knob to the OFF position.
Figure 1: Gas Shut-Off Valve Knob
3. Loosen the setscrew in the burner control knobs and remove the knobs.
4. Remove the two (2) drive screws securing the manifold cover in place and remove the
manifold cover.
5. Reverse the procedure to install the manifold cover.
Figure 2: Manifold Cover Removal
Kick Panel (All Models)
WARNING: Always perform the Electrical Lockout/Tagout procedure before removing
any sheet metal panels or attempting to service this equipment. Failure to comply with
this procedure can cause property damage, injury or death.
WARNING: Perform the GAS LOCKOUT/TAGOUT procedure before servicing the unit.
1. Perform the ELECTRICAL LOCKOUT/TAGOUT procedure.
2. Open the kick panel.
3. Remove the two (2) screws securing the left hinge and remove the hinge.
4. Slide the kick panel to the left to disengage it from the hinge.
5. Reverse the procedure to install the kick panel.
Figure 3: Kick Panel Removal