Vulcan-Hart k20GLT Hot Beverage Maker User Manual


 
Kettle Control Area - K Series Tilting Kettles
Blower Speed Control - Switch Settings
PRESSURE SWITCH (1PAS)
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
1. Open pressure relief valve until reservoir jacket
is completely vented.
2. Remove CORNER PANEL (TILTING) or SIDE
PANEL (STATIONARY).
3. Remove pressure switch from tubing.
4. Reverse procedure to install.
5. Remove air from reservoir jacket as outlined
under VENTING procedure.
6. Check for proper operation.
NOTE: Pressure switch setting is fixed and should not
be adjusted.
Fig. 9
GAS VALVE
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas before servicing the
unit.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
1. Remove
CORNER & REAR PANELS
(TILTING) or SIDE & REAR PANELS
(STATIONARY).
2. Remove electrical connector from gas valve.
3. Disconnect gas line from gas valve.
4. Remove gas valve from blower.
K Series Gas Kettles 2/3 Jacketed Stationary and Tilting - REMOVAL AND REPLACEMENT OF PARTS
Page 9 of 44 F45461 Rev. A (0713)