A SERVICE OF

logo

UPS SETUP
EATON Powerware
®
9355 UPS (10/15 kVA) User’s Guide S 164201594 Rev C www.powerware.com
15
Two-High UPS Cabinets
To remove a two-high UPS from the shipping pallet:
1. Remove the M10 bolt securing the vertical bracket to the pallet (see
Figure 6).
2. Remove and retain the three M4 screws securing the vertical
bracket to the UPS. Remove the vertical bracket.
M10 Bolt
M4 Screws
Figure 6. Removing the Vertical Bracket
3. Reinstall the M4 screws to the UPS (see Figure 7).
M4 Screws
Figure 7. Reinstalling the M4 Screws