A SERVICE OF

logo

COMMUNICATION
EATON Powerware
®
9355 UPS (10/15 kVA) User’s Guide S 164201594 Rev C www.powerware.com
52
4. Route the cable(s) to the approximate location of the cover access
holes.
5. Connect the cables to the appropriate location.
See “Communication Options” on page 53 or “Control Terminals”
on page 62 for detailed information.
6. Reinstall the front covers, starting with the bottom cabinet (see
Figure 38).
Hang the top edge of the cover on the cabinet first, then lower the
bottom edge and snap into place. Be sure the cables fit in the
access holes in the covers.
Figure 38. Reinstalling the Front Covers
7. Continue to “Operation” on page 67 to start up the UPS.