![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/7/af/7afa5bc8-e242-4971-a8c7-ea78fe9071b2/7afa5bc8-e242-4971-a8c7-ea78fe9071b2-bg2f.png)
EATON Powerware
®
9355 UPS (10/15 kVA) User’s Guide S 164201594 Rev C www.powerware.com
41
Chapter 6 Stabilizing the Cabinet
NOTE For seismic installations, you MUST order and install a Powerware 9355 UPS
seismic kit; do not use the following instructions.
NOTE For non-seismic installations, you MUST install the stabilizing bracket on all 3-high
cabinets. The stabilizing bracket is optional for 2-high cabinets.
To stabilize the cabinet(s):
1. Lower the leveling feet to prevent the cabinet from rolling.
Figure 28. Lowering the Leveling Feet
2. Attach the stabilizing bracket to the bottom of the cabinet rear panel
using the retained hardware from the shipping pallet according to
the cabinet configuration:
S For one cabinet, see Figure 29.
S For two cabinets, see Figure 30.
S For three cabinets, see Figure 31.
NOTE No more than three cabinets can be attached together. For four cabinets, use two of
the two-cabinet installations. For five cabinets, use one three-cabinet and one two-cabinet
installation.
3. Use the holes and slots in the bottom of the bracket to attach the
cabinet to the flooring if desired.