A SERVICE OF

logo

OPERATION
EATON Powerware
®
9355 UPS (10/15 kVA) User’s Guide S 164201594 Rev C www.powerware.com
72
Table 8. User Settings (continued)
Default SettingAvailable SettingsDescription
Site Wiring Fault Notice Enabled/Disabled Enabled
Reset Custom Event Settings 0 through 32 Total: 0/32
Auto Output Configuration Enabled/Disabled Enabled for initial startup
Disabled after i nitial startup
Initial Startup
Startup and operational checks must be performed by an authorized
Eaton Customer Service Engineer, or the warranty terms as specified on
page 95 become void. This service is offered as part of the sales
contract for the UPS. Contact service in advance (usually a two-week
notice is required) to reserve a preferred startup date.
UPS Startup
WARNING
Only qualified service personnel (such as a licensed electrician) should perform the UPS
installation and initial startup. Risk of electrical shock.
Verify that UPS installation has been carried out correctly and the UPS
ground has been connected.
Select one of the following startup options:
Startup Option Section
Normal mode “Normal Mode Startup” on page 73
Battery mode “Starting the UPS on Battery“ on page 74
Bypass mode “Internal Bypass Startup” on page 75
UPS maintenance bypass “UPS Maintenance Bypass Startup” on
page 76
Wall-mounted maintenance bypass “Wall-Mounted Maintenance Bypass
Startup” on page 76
Parallel UPS configuration Refer to the Powerware 9355 Parallel UPS
(10/15 kVA) User’s Guide
.