3M 800a3 Food Saver User Manual


 
19
7-INSTALLATION (continued)
2011 September
800a3-NA
7.7 Completion of Taping Heads
See Manual 2 for Complete Instructions:
1. Place the Upper Taping Head in a convenient
working position
.2. Use Figure 7-8 and tape threading label.
Position the tape supply roll so the adhesive
side of tape is facing the front of the taping head
as it is pulled from the supply roll.
3. Attach the threading needle to the end of the
roll. Guide the threading needle around the wrap
roller (Position 1) then back around the one-
way tension roller (Position 2).
4. Continue pulling the threading needle down and
guide it between the two (2) rollers on the apply
arm (Position 3).
5. Pull the threading needle down until the tape
travels between the apply plate and the ears of
the apply arm (Position 4) until it extends past
the applying roller. When properly threaded the
adhesive side of the tape should be facing the
knurled rollers at position 2 and also position 3.
6. Cut away any excess tape and repeat steps for
Lower Taping Head.
Important – Do not cut against the apply roller -
roller damage could occur.
7.11 Inspection of Phases
(For Three-Main Phases Only)
N/A
.
7.10 Machine Connection to the Mains
For technical speci cations: See Section 4 -
Specif cations
- Push the LATCHING EMERGENCY STOP
BUTTON.
- The main switch is normally OFF.
Connect the power cord supplied with the machine
to a wall socket using a plug which complies with the
safety regulations of your country.
One Way
Tension
Roller
Tension
Wrap
Roller
Knurled
Roller
Wrap
Roller
Applying
Roller
Threading
Needle
#1
#2
#3
#4
Figure 7-8
Figure 7-9
7.8 Outboard Tape Roll Holder
If you intend to use the outboard tape roll holder,
proceed as follows:
1 - Remove the lower taping head from the machine.
2 - Remove the tape drum bracket assembly, stud
spacer, and fasteners from the lower taping head.
3 - Install alternative wrap roller and bracket on the
head in place of tape bracket. Replace lower
head into machine.
4 - Install and secure tape drum bracket assembly
on the entry end of the lower frame (as shown in
Figure 7-9).
7.9 Preliminary Electric Inspection
Before connecting the machine to the mains please
carry out the following operations:
7.9.1 Make sure that the socket is provided with an
earth protection circuit and that both the mains
voltage and the frequency match the speci -
cations on the name plate.
7.9.2 Check that the connection of the machine
to the mains meets the safety regulations in
your country.
7.9.3 The machine is tted with a main switch
and a circuit breaker. The user should check
that the electrical settings of the machine are
compatible with all the components of the
mains system.