(©October, 2006)
CyberChiller Series Installation, Operation & Maintenance Manual
APPENDIX A - FORMS
Stulz Air Technology Systems Inc.
Frederick, Maryland USA 21704
Telephone: (301) 620-2033 Facsimile: (301) 620-1396
Checklist for Completed Installation
Frederick, Maryland USA 21704
CyberChiller Series Telephone: (301) 620-2033
Facsimile: (301) 620-1396
❏
1 Proper clearances for service access have
been maintained around equipment.
❏
2 Equipment is level and mounting fasteners (if
applicable) are tight.
❏
3 Piping completed to refrigerant or coolant loop
(if required).
❏
4 All field installed piping leak tested.
❏
5 Refrigerant charge added (if required).
❏
6 Incoming line voltage matches equipment
nominal nameplated rating ± tolerances.
❏ 7 Main power wiring connections to the
equipment, including earth ground, have been
properly installed.
❏ 8 Customer supplied main power circuit breaker
(HACR type) or fuses have proper ratings for
equipment installed.
❏ 9 All wiring connections are tight.
❏ 10 Control wiring connections completed to
evaporator and condenser/condensing unit
(if required), including wiring to wall mounted
control panel and optional controls.
❏ 11 Foreign materials have been removed from
inside and around all equipment installed
(shipping materials, construction materials,
tools, etc.).
❏ 12 Compressors and pumps rotate freely without
unusual noise.
❏ 13 Inspect all piping connections for leaks during
initial operation.
A-1