26
PAge heAder.....
OPERATING YOUR BREVILLE PRODUCT
c) Next, repeat the process on the left
screw. As the valve is opened, water may
begin flowing into the drip tray.
d) Allow valves to remain open until no
more water or steam escapes.
e) Close both valves by rotating screws
clock-wise until seated. Do not
overtighten screws to avoid damaging
the valves. Replace the grey silicone
cover over the valves.
f) Empty drip tray and reinsert into
position. Use caution as the drip tray
may be hot due to the water and steam
from the boilers.
COFFEE MAKING TIPS
& PREPARATION