Bunn ITCB-DV Beverage Dispenser User Manual


 
Page 8
OPERATING CONTROLS
A. ON/OFF SWITCH
Pressing the "ON/OFF" pad will alternately turn the brewer on and off. Pressing this pad during the brew cycle
will interrupt the brew cycle, stopping the flow of water. Pressing this pad during programming of the brewer
will exit the setup and return to the main screen.
B. PROGRAMMING (left)
This hidden pad can be used to scroll backwards through the function list while in programming mode.
C. BREW (A,B,C) and FUNCTION
When the ON/OFF is ON and the brewer is on the main screen (not in programming mode), momentarily
pressing and releasing this pad will begin a brew cycle. These are also used to program the brewer when in the
programming mode.
D. PROGRAMMING (right)
Pressing and holding this pad allows entry into the programming menus. Pressing and releasing the pad
steps through each function screen while in the programming mode.
E. BATCH SELECTOR PADS
Pressing the pad corresponding to the Half or Full batch selects the amount of product to be brewed. Pressing
a different pad after a brew cycle has been initiated does not change the brew batch in progress. Light indicates
the selected batch to brew. Also used in programming to adjust settings on both batch sizes.
F. FUNCTION SCREEN
This is the display which shows the various functions of the brewer and allows the programming to be ac-
complished.
G. FUNNEL SENSING COIL
This is used to "receive" information from the Smart Funnel handle, recipe cards, and ad cards.
HALF
FULL
"2%7
!
"2%7
"
"2%7
#
4-
D
B
C
READY TO BREW
WATER TEMP: 205°
A
G
F
E
36748 041504