Bunn SRU Coffeemaker User Manual


 
Page 24
SERVICE (cont.)
SELECTOR SWITCH (HALF BATCH OPTION)
FIG. 18 SELECTOR SWITCH (HALF BATCH)
P2053.25
Location:
The selector switch is located in the center of the
front access panel at the base of the urn on all models
except the 230V CE Models. The selector switch is
located to the right of the front panel, above the start
switch on the 230V CE Models.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the wires from the switch terminals.
3. Check for continuity across the switch terminals
with the switch in the "CLOSED" (bottom - half)
position. Continuity must not be present when the
switch is in the "OPEN" (top - full) position.
If continuity is present as described, the switch is
operating properly.
If continuity is not present as described, replace the
switch.
10067 040100