Cleveland Range Gas 20.20 Convection Oven User Manual


 
a The front display will include a lighted bar under the steam symbol
When the heat circuit is energized the heat symbol will be energized
The cooking mode symbol will be energized.
The time display will invert and begin to count down.
b The fan circuit is energized by the Control Board (A10) transmitting and
receiving a signal from terminals 5,6, and 7 on connector X10 to connector X12
on the Motor Drive Board (U10).
The motor Drive Board sends a signal through the thermal switch in the motor
from Terminal 5 and receives on terminal 6
If the thermal switch is not open the Motor Drive Board (U10) sends 240
VAC 3 phase to the motor.
The motor reverses direction every 120 seconds with a 15 second coast.
c Hot air heat circuit is energized
A signal is sent from terminal 8 of connector X15 on the Control Board (A10)
to terminal 4 of connector X2 on the Hot Air Power Burner and Fan Control
(U20) selecting the set speed of the combustion blower.
When this speed is attained the signal is sent from terminal 2 of connector
X2 on the Hot Air Power Burner and Fan Control (U20) to terminal 2 of
connector X15 on the Control Board (A10)
A request for heat is sent from terminal 3 of connector X12 on the Control
Board (A10) to terminal 10 on connector X1 on the Hot Air Control Module
(N20)
24 VAC is sent from terminal 2 of connector X2 on the Hot Air Control
Module (N20) to the hot surface igniter (R20).
The gas valve is energized allowing gas and air into the burner chamber to
be ignited by the hot surface igniter.
The Hot Air Burner Control Module (N20) senses at least 1.5 micro amps
DC from the flame sensor (P1) at terminal 3 of connector X2 and sends a
signal from terminal 2 of connector X1 to terminal 12 of connector X15
on the Control Board (A10)
The heat circuit will remain energized until the cabinet set temperature is
reached as sensed at probe B6.
d The steam circuit is energized
120 VAC is sent from terminal 4 of connector X12 on the Control Board
(A10) to the coil of the Y3 solenoid allowing water to be thrown against the
element until the bypass probe (B5) senses 183 degrees F.
NOTE: If the set temperature is above 212 degrees F the hot air circuit
will be energized (after the by pass probe is satisfied) until the
compartment setting is reached.
e When the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is
sent from terminal 5 of connector X12 to the condenser valve (Y1) until the
temperature drops.
f When the timer counts to 0 or the core temp probe (B10) reaches the set amount
the cycle ends and the steam generator reverts to the standby temperature of 190-
degree F.