Crane Merchandising Systems 6530006 Hot Beverage Maker User Manual


 
Hot Drink Center Set-Up Manual
26 6530006
March, 2001
m. Place the main power switch in the ON position.
n. Test the brewer to be sure the paper feeds properly:
1. On the maintenance keypad, press , then press until
the display shows BREW TEST.
2. Press to test each brewer position:
WARNING
Keep away from the brewer mechanism while it is operating.
Coming into contact with moving parts could injure you.
BREW 'R BREW The brewer is in the BREW POSITION.
BREW 'R FLIP The brewer is in the FLIP position.
BREW 'R HOME The brewer is in the HOME position.
3. Make sure the filter paper feeds properly without jamming.
o. Replace the cup station and grounds bucket.
3. Load the Coin Mechanism
a. Open the cabinet door and the monetary door.
b. Insert coins into their respective tubes until each tube has been filled.
c. Inspect the tubes for shingled coins and correct if necessary.
2
. Install the Optional Coin Box Lock
a. Install the lock cylinder,
washer, and nut in the order
shown.
b. Tighten the nut.
c. Install the lock bar as shown,
and secure with the screw.
LOCK BAR
SCREW
NUT
WASHER
LOCK
CYLINDER