Hobart ML-132079 Oven User Manual


 
– 6 –
ASSEMBLY
Carefully remove and inspect all loose parts packed with the rotisserie oven, including the following:
Overflow Tube (1) Skim Tube (1) Ceramic Logs (4)
Removable Rear Panel (1) Door Handle Knobs (2) Wire Rack (1)
Unwrap foot pedal switch and place on floor.
Screw the door handle knobs onto the door handle rods and tighten them firmly (Fig. 1).
Hang the upper edge of the removable hanging panel from the hanger strip on the rear wall inside the
rotisserie (Fig. 2). Panel must be flat against rear rotisserie oven cavity wall.
PL-41706 PL-41707
HANGING PANEL
Fig. 1 Fig. 2
Place ceramic logs on log rack. Place logs beginning on
the left side with the right side of each log angled down
(Fig. 3). Place the left ceramic log over the ignitor box to
prevent fat from clogging the burner holes.
Remove the wire rack and install the overflow and skim
tubes, wide side down, in the drains at the bottom of the
rotisserie (Fig. 4); placement is interchangeable. Replace
the wire rack.
Remove the drain handle from its shipping location on the
drain valve and install it properly on the drain valve stem
(Fig. 5).
Fig. 3
PL-41689-1
CERAMIC LOGS
IGNITOR BOX
PL-41658-1
OVERFLOW TUBE
SKIM TUBE
PL-41659-1
DRAIN VALVE STEM
DRAIN VALVE HANDLE
Fig. 4 Fig. 5