Cornelius IWC330 Ice Maker User Manual


 
12
166240004
12/1/94
Rev 3/4/96
INSTALLATION INSTRUCTIONS
Installation and start-up of the equipment should be performed by the distributor or the dealers professional
staff.
LOCATION OF EQUIPMENT
For maximum performance the location should be away from heat sources such as ovens, direct sunlight, hot
air discharge, etc.
To reduce cost of maintenance and loss of efficiency, avoid placing air-cooled equipment in areas where grease,
flour and other airborne contaminants are present. Allow a minimum of 6I (15.24 cm) clearance on all sides and
top for proper air circulation. Restricted air circulation will affect the efficiency and required maintenance of the
product.
IMPORTANT: Never operate your equipment in room temperature below 50_F (10_) or above 100_F
(38_C). Should the location of your product ever be exposed to freezing temperatures, it must be shut
down and winterized.
EQUIPMENT SET-UP
The following steps refer to the set-up of the ice bin and the cuber:
1. Remove the bin from its carton, place it on its back and install the legs into the bottom of the bin. Bins must
be installed on legs or sealed to the floor with RTV-732 sealant.
2. Set the bin up on its legs. Place the bin in its final location and level it with the adjustable feet in the legs.
3. Unpack the cuber from its carton, and set in place on the bin and adjust as required. Leave all panels on
the cuber until it is set in place on the dispenser or bin.
4. Remove all internal packing from the cuber.
THREAD LEVELING
LEG INTO BASE
NOTE: Bin adapter andcondenser air baffles may be required in certain installations.
DISPENSER INSTALLATION
The proper cuber/dispenser installation package should be ordered. This package will include gasket material
and hold-down bracket.