Due to the fact that each customer may have different requirements for the orientation of the gas booster heater relative to the
main dishmachine, the hose lengths that connect the two units must be customized during each installation. The appropriate
3/4” hosing, fittings and gaskets have been provided.
To prevent incorrect measurements of the hose, it is recommended to place one barbed hose fitting into the end of the uncut
length of hose coil and attach that fitting to an appropriate connection. Run the hose to the corresponding connection on the
other unit before cutting the hose. Use a barbed hose fitting that is screwed into the second connection on the other unit before
cutting the hose. Use a barbed hose fitting that is screwed onto the second connection to gauge the correct distance. Ensure
a smooth “flow” of hose without any sharp turns or kinks.
To aid in pushing the barbed hose fitting into the hose, place the fitting on a hard surface (i.e. the floor) with the barbed end of
the fitting pointing upward and push the hose down onto the fitting. A small amount of lubricant (i.e. petroleum jelly) may aid in
this process.
AJ-44C Series Technical Manual 7610-001-76-22
Issued: 03-21-2006 Revised: N/A
SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
GAS CONVEYOR HOSE INSTALLATION
44
Barbed Hose Fitting
Connection
Attach the hose fitting to this
connection before making the
cut at the other end of the
hose.
Hose
Cut the hose at the location
where the hose is even
with the yellow plastic stop.