Vulcan-Hart ECO2D Convection Oven User Manual


 
HALF-SIZE CONVECTION OVENS - REMOVAL AND REPLACEMENT OF PARTS
4
REMOVAL AND REPLACEMENT OF PARTS
COVERS AND PANELS
WARNING:
DISCONNECT THE ELECTRICAL
POWER TO THE MACHINE AT THE MAIN CIRCUIT
BOX. PLACE A TAG ON THE CIRCUIT BOX
INDICATING THE CIRCUIT IS BEING SERVICED.
WARNING:
SHUT OFF THE GAS BEFORE
SERVICING THE UNIT. (When applicable)
Top Front Cover
1. The top front cover is secured with four screws,
two on each side of cover. Remove these screws
then pull cover off unit.
2. Reverse the procedure to install.
Control Panel
1. On gas models, remove the handle from the
manual gas valve.
2. Remove the three screws from the left front and
loosen the three screws on the right side of the
control panel.
3. Pull the panel away from the oven.
4. Unplug the lead wires to the control panel
components and disconnect the temperature
probe leads.
5. Reverse the procedure to install.
Right Side Panel
1. Remove the three screws which secure the right
side of the control panel.
2. Loosen the two screws on the right side of the top
front cover.
3. Remove the remaining eight screws securing the
right side panel.
4. Pull the right side panel out at the bottom then
down to remove.
5. Reverse the procedure to install.