Miele KFN 9755 IDE Refrigerator User Manual


 
All plumbing work should be carried
out by a suitably qualified and
competent person, in accordance
with all applicable local and national
regulations.
The manufacturer is not liable for
damage to property due to an
incorrect installation or water
connection.
The water quality must conform to
country requirements for drinking
water.
The appliance is only suitable for
connection to the cold water supply.
Water pressure on-site:
Minimum: 14.5 psi
Maximum: 145 psi, if higher, install a
pressure reduction valve.
A separate shut-off valve must be
installed, so that the water supply
can be interrupted as needed. If one
is not present, have a water valve
installed by a licensed plumber.
It must be easily accessible after the
appliance has been built-in.
Suitable 1/4" tubing or copper piping
must be supplied for plumbing.
To ensure the best ice cube quality,
the maximum length of the tubing or
copper pipe should not exceed 4 ft.
11" (1.5 m). If too much water
remains in the tubing the quality
could be affected.
Connecting the water supply
Before any installation or
maintenance work is performed be
sure the appliance is disconnected
from the electrical supply.
Connection to the water supply should
include a shut-off valve with a 3/4"
thread.
^
Remove the cover cap a from the
solenoid valve b.
^
Install the compression fitting c with
the sealing ring d on the solenoid
valve b.
^
Attach the copper line e to the
compression fitting c.
^
Secure the copper line to the
appliance using cable clips f.
Plumbing
39