Taylor custard machine Blender User Manual


 
20
Model C043Operating Procedures
IMPORTANT! Your hands must be clean
and sanitized before proceeding with the next
steps.
Step 13
Remove the splash guards from the doors.
Figure 28
Step 14
Remove the chute from the hopper.
Figure 29
Step 15
Install the feed tube assembly into the mix inlet hole
located at the bottom of the hopper. Make sure the
feed tube is completely seated in the mix inlet hole.
Figure 30
Step 16
Place one end of the flow control rod into the hole
located on the feed tube. Place the other end of the
rod into the hole on the front flow control lever.
Figure 31
Step 17
Discard t he sanitizer.
Repeat these steps for the remaining freezing
cylinders.