24
Models 150, 152, 162, 168Operating Procedures
Priming
Prime the machine as close as possible to the time of
first product draw.
Step 1
With a pail beneath the door s pout, raise the draw
valve. Fill the mix hopper with fresh mix. (Maximum
hopper c apacity is 8 quar ts [7.6 liters].) Allow the mix
to flow into the freezing cylinder. This will force out any
remaining sanitizing solution. When full strength mix is
flowing from the door spout, lower the draw valve.
Note: Use only FRESH mix when priming the
freezer .
Figure 36
Step 2
When the mix has stopped bubbling down into the
freezing cylinder, install the feed tube in t he m ix inlet
hole. Make sure the small hole inthe feed tube isdown.
Figure 37
Step 3
Momentarily raise the draw switch paddle to activate
the refrigeration cycle. Place the power switch in the
“AUTO” position. When the unit cycles off, the product
will be ready to serve.
Figure 38
Step 4
Place the mix hopper cover in position.
Repeat Steps 1 through 4 for the second freezing
cylinder on Models 162/168.
Step 5
Install the front drip tray and splash shield under the
freezer door.
Figure 39