FULL SIZE GAS CONVECTION OVENS - SERVICE PROCEDURES AND ADJUSTMENTS
F24682 (Rev. B, October 2007)Page 25 of 68
DOOR ADJUSTMENT
1. Check the doors to make sure they have an
equal gap between them and that the vertical
edge of the door is parallel to the vertical door
seal. If the doors are not positioned in this
manner, adjust the doors as described.
2. Remove the top front cover.
3. Loosen the screws that secure the upper door
bearings and related hardware, just enough to
allow door movement.
4. Move the door until proper alignment is
achieved then tighten the screws on the upper
door bearing hardware.
5. Repeat step 3 and 4 on the opposite door, if
necessary.
DOOR STRIKE ADJUSTMENT
(INDEPENDENT DOORS)
NOTE: For units with serial number starting with 48
made after 8/12/07 and serial number starting with
54 made after 8/26/07.
1. Remove top front cover as outline under
COVERS AND PANELS in REMOVAL AND
REPLACEMENT OF PARTS.
2. Open the doors and inspect door strike for
proper shape.
A. Replace if bent. Do not bend strike plate.
B. If adjustment is necessary, loosen
fasteners, close doors and insure contact
between door inner surface and upper
horizontal seal. Slide door strike plate until
contact with roller latch is made. Tighten
strike plate fasteners.
3. Open and close the doors several times while
observing the roller latch and strike plate
operation.
A. Replace roller latch if malfunctioning as
outlined under ROLLER LATCH
ASSEMBLY (INDEPENDENT DOORS)
and adjust as outlined in this procedure.