Acnodes FPC 8084 Kitchen Entertainment Center User Manual


 
FPC 8084 Users Manual
right-center point, bottom-center point and left-center point in
sequence. After calibration, the data is shown in the screen, press any
key to continue the progress.
3. After the calibration, suggest you to test touch screen and display
mapped results by choose “3” DRAWING TEST under PM.BAT
3.2.3.4 Initializing the PenMount driver
If you don’t have the initialization commands in AUTOEXEC.BAT,
initialize PenMount C:\PENMOUNT\PMINIT) controller before you use
the PenMount Touch Screen. The display will show the initialization
message:
PenMount V7.06 Copyright(c) SALT International Corp.
Test:COM<n> IRQ<n> (<n> is the number after PMDETECT done)
PenMount communication settings: COM<N> IRQ<n> Baud Rate:
<xxxx>
... ... ... ... ... ... ... ... ... ...
3.2.4.5 Demonstration
To demonstrate or test touch screen operation, selecting “3”
DRAWING
TEST in PM.BAT file of Utility Directory. Drawing on screen.The other
demonstration program called “ICECREAM.EXE” in the
“PENMOUNT” directory can also be applied.
3.2.4 Driver Installation- Linux
.3.2.4.1 Advance Setup
1. Before install the Touch Screen Driver, please open the file in
Linux
File /etc/rc.local
29