Installation
PARTS, TOOLS, MATERIALS
YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE INSTALLATION:
Ca=tonor other heavy material for covering the counter top,
Clear tape Stud finder or thin nail,
(for taping the templates to the wall)
I Phillips screwdriver (for the screws)
Pencil
Flat blade screwdriver (for the toggle bolts)
Measuring tape (metal preferred)
Small side cutters or tin snips
Keyhole saw (for the power cord hole)
Electric drill
3/8" and 3/4" wood drill bits
1/2" and 3/16" ..x_.====.
drill bits
Plumb line
Duct Tape
Caulking gun
• If you have brick or masonry walls, you wiltneed special hardware and tools.
• The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft
damper.
- 35 -