Bunn Single SH Coffeemaker User Manual


 
Page 26
SERVICE (cont.)
LEVEL CONTROL BOARD AND LEVEL PROBE
Location:
The level control board is located inside the front
in center of the brewer on the component bracket. The
level probe is located inside the hood on the center rear
of the tank lid.
Test Procedure:
1. Disconnect the brewer from the power source.
2. Remove the violet wire from terminal 1 & pink wire
from terminal 4 of the circuit board.
3. Check the voltage across terminals 2 & 3 with a
voltmeter. Connect the brewer to the power source.
The indication must be:
a.) 120 volts ac for two wire 120 volt models, three
wire 120/208 volt models and three wire 120/240
volt models.
b.) 200 to 240 volts ac for two wire 200, 230 or 240
volt models.
4. Disconnect the brewer from the power source.
If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the
wiring diagrams and check the brewer wiring harness.
5. Reconnect the violet wire to terminal 1.
FIG. 18 LEVEL CONTROL BOARD AND LEVEL
PROBE
22978.0000
TL5
TL4
TL3
TL2
TL1
J2
J
1
S
E
T
L
O
C
K
LOCK
SET
1
2
3
4
5
6
1 2 3 4 5 6
BUNN
90 psig max operating pressure
Strainer/Flow Control # 22300.033 0
(Repl. Flow Washer #20526.0330)
(Repl. Screen #23721.0000)
.500 gpm FLOW