Bunn Single SH Coffeemaker User Manual


 
Page 38
SERVICE (cont.)
DIGITAL TIMER (Late Models)
Location:
The timer is located inside the left front of the
brewer on the upper part of the component bracket.
Test Procedures:
NOTE: Do not remove or install wires while timer board
is installed. Pressure applied to one side may cause
damage to the board.
1. Disconnect the brewer from the power source and
remove the front access panel.
2. Remove the two #8-32 screws securing circuit
board to the mounting bracket.
3. Remove circuit board and spacers (as required).
4. With a voltmeter, check the voltage across termi-
nals TL1 and TL2 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source. The indication must be:
a) 120 volts ac for two wire 120 volt models and
three wire 120/240 volt models.
b) 200 to 240 volts ac on two wire 200 volt or 240
volt models.
5. Disconnect the brewer from the power source.
If voltage is present as described, proceed to #6.
If voltage is not present as described, refer to the
Wiring Diagrams
and check the brewer wiring har-
ness.
TL5
TL4
TL3
TL2
TL1
J
2
J
1
S
E
T
L
O
C
K
LOCK
SET