2. Operation Board
1) Use the “ON/OFF” button on the operation panel to turn off the unit, then turn off the
dishwasher and booster tank power supplies. Lockout/Tagout to prevent the power
supplies from being turned back on inadvertently.
2) Remove the screws securing the operation box and the cable cover to the top of the
dishwasher.
3) Remove the 4 screws from the bottom of the operation box, and remove the cover.
4) Remove the screws securing the stay - OP, joint - operation (B), and operation panel
(B).
5) Disconnect the connector for the operation board cable and the cable - operation.
6) Install the new operation board.
Note: Remove the 2.0 mm dia tube (A) from the inside groove of the old board, and
attach the tube (A) to the new board.
7)
To replace, reverse the above procedure.
Note: Make sure the tubes are snug inside the joint - operation (B) and operation panel
(B).