Saeco Coffee Makers SG200E Coffee Grinder User Manual


 
14
English
6.2 Receipt
Upon receipt of the automatic vending machine,
it is necessary to check it has not suffered
damage during transport. If damage of any kind
is noticed, immediately place a claim with the
forwarder.
An envelope is supplied with the vending
machine, called CUSTOMER KIT. It contains
the objects shown in Fig. 10.
- Instruction manual.
- Powder tank plates and prices in
euro.
- Push-button panel selection plates.
- Instruction plates.
- Wiring and hydraulic diagram.
- Power cord.
- Safety switch key
(Technical engineer).
- Declaration of conformity
- When positioning the vending machine, check
its levelling by means of the adjustable feet
already fitted under the vending housing (fig.
8) or under the cabinet (fig. 9) Make sure that
the vending machine does not have an
inclination exceeding 2 degrees.
The Saeco International Group declines all
responsibility for troubles due to the failure in
observing the assembly rules.
If installation takes place in safety evacuation
corridors, make sure that the machine with the
door open assure sufficient space for people to
pass by (fig. 7).
In order to avoid the floor from getting dirty as a
result of accidental spillage of products, place a
sufficiently wide protection to cover the working
area under the vending machine.
fig.8
fig. 9
fig. 10