21
Models 336, 338 & 339 Operating Procedures
Step 9
Assemble the hopper gasket around the top edge of
the mix hopper. Stand the air tube in the corner of the
hopper.
Figure 33
Repeat Steps 1 through 9 for the other side of the
freezer.
Priming
Step 1
With a pail beneath the door spout, lower the draw
handle. Be sure the prime plug is still in the UP
position. Pour two gallons (7.6 liters) of fresh mix into
the mix hopper and allow it to flow into the freezing
cylinder. This will force out any r emaining sanitizing
solution. When full strength mix is flowing from the
door spout, raise the draw handle.
Note: Use only fresh mix when priming the freezing
cylinder.
Figure 34
Step 2
Once a steady stream of mix starts to flow from the
prime plug opening in the bottom of the freezer door,
push down the prime plug.
Figure 35
Step 3
Lubricate the o--rings on the air tube on the end with
the small hole on the side.
Step 4
Install the air tube in the “AUTO” position.
Figure 36