Vulcan-Hart ML-136058 Electric Steamer User Manual


 
MODEL C24EA - SWITCHES, SOLENOIDS, RELAY, AND BUZZER
F35453 (July 2008) Page 30 of 68
COMPARTMENT STEAM
SOLENOID
1. Turn off machine to drain steam generator.
Allow steamer to complete drain cycle.
2. Remove RIGHT SIDE BASE PANEL as
outlined under COVERS AND PANELS.
3. Locate compartment steam solenoid connected
to cooking compartment.
4. Disconnect electrical wiring to solenoid coil.
5. Disconnect steam hose from the outlet side of
solenoid.
NOTE: Use new band clamps when connecting
hoses. See TOOLS.
6. Remove solenoid from steam supply manifold.
A. Remove pipe fittings from solenoid.
7. Reassemble parts removed in reverse order.
Apply pipe thread sealant to pipe threads before
installation.
8. Check steamer for proper operation.
TIME DELAY RELAY
1. Turn off machine to drain steam generator.
Allow steamer to complete drain cycle.
2. Remove FRONT BASE PANEL as outlined
under COVERS AND PANELS.
3. Note electrical connections for the time delay
relay then disconnect lead wires from relay.
4. Remove screw securing relay to low voltage
control box then remove relay.
5. Reassemble parts removed in reverse order.
6. Check steamer for proper operation.
NOTE: When installing, ensure time delay knob is
rotated fully CCW to the lowest setting (approx. 2
seconds). Remove jumper wire for proper operation
at steamer control circuit voltage (120VAC).
LOWER COMPARTMENT SOLENOID SHOWN