14
DRIVE BELT HEIGHT
The drive belt assemblies can be raised 50 mm
[2 inches] to provide better conveying of tall
boxes. Refer to page 26, "Special Set-Up
Procedures – Drive Belt Assembly Height", for
set-up procedure. Note – Raising drive belts
increases the minimum box height that can
be taped to 190 mm [7-1/4 inches].
ELECTRICAL CONNECTION AND CONTROLS
The electrical control box, shown in Figure 3-1,
contains the "On/Off" switch with pre-set circuit
breaker and can be located on either side of the
machine frame for customer operating
convenience. A standard three conductor power
cord with plug is provided at the back of the
electrical control box for 115 Volt, 60 Hz, 3.8 Amp
electrical service. The receptacle providing this
service shall be properly grounded. Before the
power cord is plugged into 115 Volt, 60 Hz
outlet, make sure that all packaging materials
and tools are removed from the machine. Do
not plug electrical cord into outlet until ready
to run machine.
Installation and Set-Up (Continued)
Use of an extension cord is not recommended.
However, if one is needed for temporary use, it
must have a wire size of AWG 16 [1.5 mm dia],
have a maximum length of 30.5 m [100 ft], and
must be properly grounded.
WARNING – To prevent shock and
fire hazard: Position extension
cord where it will be out of the way of foot
or vehicle traffic. Extension cord is only
for temporary use – do not use for a
permanent installation.
Note – Machines outside the U.S. may be
equipped with 220/240 Volt, 50 Hz systems,
or other electrical requirements compatible
with local practice.
INITIAL START-UP OF CASE SEALER
After completing the "Installation and Set-Up"
procedure, continue through "Operation" for tape
loading and start-up to be sure case sealer is
properly adjusted to run boxes.