Cleveland Range KET-3-T Hot Beverage Maker User Manual


 
1
GENERAL
Installation of the kettle must be accomplished by
qualified electrical installation personnel working
to all applicable local and national codes.
Improper installation of product could cause injury
or damage.
This equipment is built to comply with applicable
standards for manufacturers. Included among
those approval agencies are: UL, NSF, ASME/Ntl.
Bd., CSA, CGA, ETL, and others. Many local
codes exist, and it is the responsibility of the
owner/installer to comply with these codes.
Note: Maximum voltage for LVD (low volt
directive for Europe) to be 440 volts for CE
marked appliances.
INSPECTION
Before unpacking visually inspect the unit for
evidence of damage during shipping.
If damage is noticed, do not unpack the unit, follow
Shipping Damage Instructions shown below.
SHIPPING DAMAGE
INSTRUCTIONS
If shipping damage to the unit is discovered or
suspected, observe the following guidelines in
preparing a shipping damage claim.
1. Write down a description of the damage or the
reason for suspecting damage as soon as it is
discovered. This will help in filling out the claim
forms later.
2. As soon as damage is discovered or
suspected, notify the carrier that delivered the
shipment.
3. Arrange for the carrier's representative to
examine the damage.
4. Fill out all carrier claims forms and have the
examining carrier sign and date each form.
INSTALLATION
The first installation step is to refer to the
Specification Sheets or Specification Drawings for
detailed clearance requirements of the kettle.
Next, carefully cut open the shipping carton for
easy removal of the kettle.
CLEARANCE REQUIREMENTS
* From back of mounting base.
POUR PATH
Kettle Size Min. Max.
3 Gallon 2” 12”
6 Gallon 3.5” 18”
12 Gallon 4” 24”
20 Gallon 6” 28”
Model # Back* Left Side Right Side
KET-3-T 2 1/4” 0 0
KET-6-T 2 3/4” 0 0
KET-12-T 5 1/2” 0 0
KET-20-T 8” 0 0
TKET-3-T 6 5/8” 0 0
TKET-6-T 7 1/8” 0 0
TKET-12-T 9 7/8” 0 0
INSTALLATION
Min.
Max.