Hobart FT1000S-ER Dishwasher User Manual


 
– 34 –
Fig. 38
NOTE:Theproperlengthofconveyor,whenadjusted,willhavetheightlinksclose
toengagingtheloadngersattheloadplatform.Itmaybenecessarytoremove
oneortwoconveyorrods(withrowsofightlinks)toobtainthedesiredlength.
NOTE: Each time a conveyor roller is installed or replaced, a NEW retaining ring
(Fig. 35) must be used.
Once the conveyor is installed, reinstall the conveyor drive chain to the conveyor
gear motor.
Adjusting the Conveyor Take-Up Unit (Load Section)
Tighten the tension on the conveyor by turning the adjusting bolts on the take-up
units until the conveyor is no longer sagging at either the load or unload end and then
re-tighten the two stop nuts located on both the front and rear take-up assemblies
on the outside of the tracks (Fig. 39).
ADJUSTING BOLT
STOP NUTS
Fig. 39