White Mountain CIDV-30-20 Oven User Manual


 
15628-9-1007Page 22
Figure 27
Figure 28
Attach and secure the termination to the last section of horizontal
venting by rotating and interlocking the ends as previously
described.
NOTE: Termination cap should pass through the wall firestop
from the exterior of the building. Adjust the termination
cap to its final exterior position on the building.
WARNING: Termination cap must be positioned so that
the arrow is pointing up.
Using the termination cap in the center of the square hole, attach
the termination cap with the four wood screws provided. Before
attachment of the termination, run a bead of silicone sealant rated
above 250°F on its outside edge too, so as to make a seal to that
exterior wall.
NOTE: Wood screws can and should be replaced with appropriate
fasteners for use on stucco, brick, concrete or other types
of siding.
CAUTION: If exterior walls are finished with siding (vinyl,
aluminum, etc.), it is necessary to install the vinyl siding shield
(SD-950).
Vinyl siding shield (SD-950) will be installed between the vent
termination and the exterior wall. (See Figure 29) This horizontal vent
termination bolts onto the flat portion of the vinyl siding standoff, so
an air space will exist between the wall and the termination cap.
Figure 29
HORIZONTAL TERMINATION