York R134A Refrigerator User Manual


 
JOHNSON CONTROLS
FORM 201.23-EG1 (1007)
137
components.
4. Louvered/Wire Panels: Louvered steel panels
on external condenser coil faces, painted to
match unit panels. Heavy gauge, welded wire-
mesh, coated to resist corrosion, around base
of machine to restrict unauthorized access.
E. Evaporator options:
1. Provide 1-1/2” (38mm) cooler insulation in lieu
of standard 3/4” (19mm).
2. Provide Raised Face Flanges for cooler
nozzles:
a. 150 PSIG (10.3 bar), welded anges (eld
kit, matching pipe ange by contractor).
b. 150 PSIG (10.3 bar) companion anges.
(not available with 460V units)
c. 150 PSIG (10.3 bar), ANSI/AWWA C-606
couplings (eld kit, matching pipe ange
by contractor).
F. Flow Switch (Field Mounted): Vapor proof SPDT,
NEMA 3R switch [ ___150 PSIG (10.3 bar) or
___300 PSIG (20.7 bar)], -20°F to 250°F (-28.9°C
to 121.1°C).
G. Building Automation System Interface:
1. Chiller to accept 4 to 20mA or 0 to 10 VDC
input to reset the leaving chilled liquid tem-
perature. (Factory Mounted)
H. Multi-Unit Sequence Control (Field Mounted): Sepa-
rate Sequencing control center provided to permit
control of up to eight chillers in parallel based on
mixed liquid temperature.
I. Vibration Isolation (Field Mounted):
1. Neoprene Isolators.
2. 1 Inch Deection Spring Isolators: Level ad-
justable, spring and cage type isolators for
mounting under the unit base rails.
3. 2 Inch Deection Seismic Isolators: Level
adjustable, restrained mounts in rugged welded
steel housing with vertical and horizontal limit
stops. Housings shall be designed to withstand a
minimum 1.0g accelerated force in all directions
to 2” (50.8 mm).
J. Service Shut-Off Valve: Provide suction service shut-off
valve for each compressor. (Factory Mounted)
PART 3 — EXECUTION
3.01 INSTALLATION
A. General: Rig and Install in full accordance with Manu-
facturer’s requirements, Project drawings, and Contract
documents.
B. Location: Locate chiller as indicated on drawings, includ-
ing cleaning and service maintenance clearance per
Manufacturer instructions. Adjust and level chiller on
support structure.
C. Components: Installing Contractor shall provide and install
all auxiliary devices and accessories for fully operational
chiller.
D. Electrical: Coordinate electrical requirements and con-
nections for all power feeds with Electrical Contractor
(Division 16).
E. Controls: Coordinate all control requirements and con-
nections with Controls Contractor.
F. Finish: Installing Contractor shall paint damaged and
abraded factory nish with touch-up paint matching fac-
tory nish.