Intel mPGA604 Ventilation Hood User Manual


 
R
mPGA604 Socket Design Guidelines 7
Re-Validation Notice to Socket Vendors
Any significant change to the socket will require submission of a detailed explanation of the change
at least 60 days prior to the planned implementation. Intel will review the modification and
establish the necessary re-validation procedure that the socket must pass. Any testing that is
required MUST be completed before the change is implemented.
Typical examples of significant changes include, but are not limited to, the following: plastic
material changes including base material or color; contact changes including base material, plating
material or thickness; and design modifications.
For details on validation testing requirements, see Section 6.