MTD -ERV 365 Ventilation Hood User Manual


 
4
28 Instructions for the Installer
RIGHT
n
Ensure that the water lock of the connec-
tion to the house sewage system is always
fi lled with water.
Menu Possibilities
P1 Read off the status (from menu P2)
P2 Set time delays (and indication “F
ILTER
DIRTY” and setting values for extractor
hood and sensors)
P3 Setting the ventilation levels
P4 Read off the temperature, relative hu-
midity and CO2 concentration.
P5 Setting additional control functions
P6 Setting additional control functions
P7 Read off and reset malfunctions (and
system information)
P8 Setting 0-10 V connections
P9 Read off the status (from menu P5)
The P menus P1, P2 and P9 are accessible for the user
and serve mainly for reading off statuses and for set-
ting time delays. For further information, see section
2.3.7. The remaining P menus P3 to P7 are reserved
exclusively for the installer.
In the P menus the user may:
- only set the additional functions P1,
P2 and P9.
The remaining P menus P3 to P7 are re-
served for the installer.
Access to the P menus
Proceed as follows:
1 Press simultaneously on " " and
"
".
2 Wait until the "P menu" appears on the display.
The P menus P1, P2 and P9 are now
accessible.
Commissioning can be carried out with the P menus
via the CC Ease operating unit. These P menus allow
various settings (in particular for ventilation control)
to be selected for the MTD-ERV 350. An overview of
the available P menus is given below:
Connection
The warm exhaust air is cooled by the outside air in
the heat exchanger. As a result, the moisture con-
tained in the room air condenses in the heat ex-
changer. The condensation forming in the heat ex-
changer is discharged via the condensation tray into
the condensation drain.
The connection for the condensation drain has an
outside diameter of 32 mm. This is located on the
underside of the MTD-ERV 350.
Connect the condensation drain to the water
lock of the home drainage system using a pipe
or hose.
Position the upper edge of the water lock at
least 40 mm below the condensation drain of
the MTD-ERV 350.
Ensure that the end of the pipe or hose ends
under the water level.
ta setanimret dne esoh eht taht erusnE
least 60 mm below the water level. This
will prevent the MTD-ERV 350 from draw-
ing in air.
4.4 Commissioning the MTD-ERV 350
The MTD-ERV 350 can be put into operation after
installation.
MTD-ERV 350