Chapter 1
Valve Oven Overview Installation and Power Requirements
14 Operating Manual
When up to two Valco Purged valves are required (e.g. applications with
Pulsed Discharge Detector), this option has to be selected for their housing.
For more informations, refer to Valve Oven Components.
NOTE When any Valve box (heated or unheated) is configured with valves, these are factory
tested to verify actuation but are NOT plumbed.
Plumbing can be performed upon availability of plumbing diagrams.
Materials needed:
Shop air or bottled air at a pressure of 60–80 psi
Helium, Nitrogen, or other gas depending on your applications
Installation and Power Requirements
The Valve Oven is attached to TRACE GC Ultra and it is factory installed and
configured. On-site installation is related to the gas plumbing defined by the
customer’s application or accompanying diagram.
Figure 1-2. The Valve Oven and the TRACE GC Ultra