Vulcan-Hart 72CS Range User Manual


 
Fig. 18
7. Remove gas line tubing from thermostat.
8. Pull capillary tube through the hole in oven
sidewall and remove thermostat from oven.
A. Note orientation of compression fittings on
thermostat body and remove for installation
on replacement valve body.
Clean pipe threads and apply thread
sealant that is suitable for use with propane gases.
When installing, do not bend and kink the
capillary tube or damage to the control may occur.
NOTE: When installing thermostat capillary tube,
push any insulation back through grommet and
remove loose insulation from oven cavity.
9. Reverse procedure to install and check for proper
operation.
CONVECTION OVEN PILOT
ASSEMBLY AND THERMOCOUPLE
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas before servicing the
unit.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
1. Lower the KICK PANEL (24" & 30" OVENS).
2. Remove screws securing burner carrier to oven
frame.
Fig. 19
3. Pull burner carrier out through opening in lower
oven frame enough to access the oven pilot
assembly.
Fig. 20
4. If replacing thermocouple only, remove
thermocouple from oven pilot assembly.
When installing, do not bend and kink the
capillary tube or damage to the component may occur.
A. Remove CONTROL PANEL (30" OVENS).
B. Remove thermocouple from gas safety
valve and remove thermocouple from oven.
Continue to last step.
5. If replacing oven pilot assembly, remove pilot
tubing and thermocouple from oven pilot
assembly.
6. Remove screws securing oven pilot assembly to
burner carrier.
7. Reverse procedure to install and check for proper
operation.
ENDURANCE / CHALLENGER MODULAR SERIES GAS RANGES - REMOVAL AND REPLACEMENT OF PARTS
Page 11 of 38 F45471 Rev. A (0615)