Fujitsu MB2145-507 Espresso Maker User Manual


 
15
CHAPTER 2 CONNECTION AND SETTINGS
This chapter explains how to connect the emulation pod and set switches. It also
describes power-on and power-off sequences.
Read this chapter before turning the power on.
2.1 "System Configuration"
2.2 "Connecting the 2140 Main Unit"
2.3 "Connecting the Probe Cable"
2.4 "Connecting the External Probe"
2.5 "Mounting the Evaluation MCU"
2.6 "Supplying a Clock to the Evaluation MCU"
2.7 "Emulator-specific Power Supply"
2.8 "Switching the C-pin Circuit Connection"
2.9 "Power-on Sequence"
2.10 "Power-off Sequence"