Heartland 6210 Convection Oven User Manual


 
12
Installationmustbedonein
accordance with all local and
national codes.
Use only materials which
conform to local codes in
effect. Be sure power is
disconnected before doing
anyelectricalwork.Allduct
workmustbemetal.
Do not use plastic duct.
The range hood should
never be exhausted into
a wall cavity or an attic
where an accumulation of
grease could become a re
hazard.
When the installation is
completed, turn on the fan
andmakesurethatthereare
noobstructionsintheduct.
30" Model
48" model
Venting Safety Guidelines
Vented Installation, Tools, Material, and Dimensions
Tools required to install vented hood: -Hammer -Slotscrewdriver
- Pliers - Electric drill
-Measuringtape -3/32”(3mm)Drillbit
-1/2”(13mm)Drillbit -SabresawORKeyholesaw
Materials Required:
-31/4"x10"(82.55mmx254mm)metalduct—enoughtogothroughwallorattictooutside.Elbowsasrequired.
-Roofcaporwallventhood
-Caulkingtosealaroundduct
-#6x1/2”(82.55mmx254mm)sheetmetalscrews
Theabovearestandardpartsandareavailableatanyhardwarestoreorheatingcontractor.
NOTE: A 3 1/4" x 10" (82.55 mm x 254 mm) exhaust adaptor is included with the exhaust hood.
52”
(132 cm)
with bottom drawer fully open
43-3/4”
(111 cm)
with oven
door open
0” clearance
to the back
3” (7.6 cm)
14”
(36 cm)
29-1/2”
(75 cm)
56”
(142 cm)
36-1/8”
(92 cm)
47-1/2”
(121 cm)
39-3/4”
(101 cm)
66-1/4”
(168 cm)
20”
(51 cm)
Range Hood Outlet
3-1/4” x 10”
(8.3 x 25.4 cm)
Oven
Exhaust
Power
Cord
Exhaust
Hood
Receptacle
52”
(132 cm)
with bottom drawer fully open
43-3/4”
(111 cm)
with oven
door open
0” clearance
to the back
3” (7.6 cm)
14”
(36 cm)
29-1/2”
(75 cm)
Range Hood Outlet
3 1/4"x10"
8.3 cmx 25.4 cm
66 1/4"
168.3 cm
62 3/8"
159 cm
56"
142.2 cm
36 1/8"
92 cm
29 3/4"
76 cm
13 3/4"
35 cm